In the time period of 29 days beginning October 21, 2024, the data indicates 3 operability checks were conducted for stem.utah.gov. Availability tests determined stem.utah.gov was functional 3 times, the last check on October 21, 2024, resulted in a 200 status code. According to the checks, stem.utah.gov experienced zero downtime as of November 20, 2024. Based on the replies received, it is confirmed that there were no error responses as of November 20, 2024. Stem.utah.gov's October 21, 2024, 0.696 seconds response contrasted the 0.562 seconds average response time.